Basslink, a subsea cable connecting George Town in Tasmania and Loy Yang in Victoria, has a possible fault with the cable which is approximately 100km off the Tasmanian coastline in Bass Strait. Using the Subsea Hydraulic Cable Grab and a team of personnel from Pharos, the cable will be recovered for repair. Pharos delivered a work package with the rapid mobilisation of Expertise, Equipment to locate, and recover the subsea cable.
Reacting quickly to customer requirements the system was prepared and shipped within 2 days.